Every half hour, Elexon compares what each party in Great Britain’s electricity market contracted to buy or sell with what its meters recorded. It runs this settlement under the Balancing and Settlement Code (BSC). Any difference is charged or paid at a single imbalance price.

01

Settlement periods

Each day has 48 settlement periods of 30 minutes, in local time. Period 1 runs from midnight to 00:30 and period 48 from 23:30 to midnight. The day the clocks go forward has 46, and the day they go back has 50.

02

Contracts

Each party holds two energy accounts with Elexon, one for production and one for consumption. Parties trade energy for each period ahead of time, in bilateral deals and on exchanges. They report the volumes to Elexon in energy contract volume notifications (ECVNs). An ECVN moves a volume from the seller’s energy account to the buyer’s. Exchanges send them for their members. A second kind, the metered volume reallocation notification (MVRN), hands part of a unit’s metered volume to another party.

03

Two deadlines

Gate closure comes one hour before each period starts. By then each unit in the Balancing Mechanism, such as a power station, has sent NESO a physical notification of what it plans to produce or consume. That figure is then fixed. From gate closure NESO balances the system in real time through the Balancing Mechanism, which has its own note. Parties can still notify contracts until the period starts. After that their contracted positions are fixed.

04

The imbalance

After the period, meter readings show what each party actually put onto the system or took off it. Elexon compares that with the party’s contracts, account by account. A party that used more than it bought, or generated less than it sold, is short. One that used less or generated more is long. Volume a unit changed on NESO’s instruction is taken out first.

05

The price

Each period has one imbalance price. Until 5 November 2015 there were two, one for short parties and one for long ones, and modification P305 made them one. Short parties pay the price on their shortfall and long parties are paid it on their surplus. When the price is below zero, the direction flips.

Elexon calculates the price from data NESO sends about its balancing actions in that period. These are the bids and offers it accepted in the Balancing Mechanism, and the actions it took outside it. An offer is a price to put more energy onto the system, and a bid is a price to take some off.

First, Elexon flags actions that may have been taken for system reasons, such as a network constraint. It then nets the buys against the sells, most expensive first. What is left shows which way the system was out of balance. If NESO bought more than it sold, the system was short, and the price comes from what it bought. Flagged actions left over that cost more than any unflagged one are repriced. The price is the volume weighted average of the most expensive 1 MWh that remains, plus a price adjustment.

Elexon pays any surplus from imbalance charges back to parties and charges them any shortfall.

06

A worked example

These numbers are invented, and the example leaves out transmission losses, which the real calculation includes.

For period 36, 17:30 to 18:00, a supplier has bought 400 MWh. Its customers use 412 MWh, leaving it 12 MWh short. A generator has sold 300 MWh and produces 303 MWh, leaving it 3 MWh long. The imbalance price for the period is £95/MWh.

The supplier pays 12 × £95 = £1,140 for energy it used without buying. The generator is paid 3 × £95 = £285 for its extra output. If the price had been minus £95/MWh, the supplier would be paid £1,140 and the generator would pay £285.

07

Settlement runs

Elexon settles each day several times. An interim run 4 working days after the day is for information only. The first run that moves money is the initial settlement run, 15 working days after the day, and payment follows 29 calendar days after the day. Reconciliation runs follow as better meter data arrives, and the final one comes about 14 months after the day.

That timetable is getting shorter as every meter moves to half hourly settlement in the MHHS programme. For days from 1 October 2026, the final run comes after 7 months. Elexon is adding those runs to its settlement calendar from April 2027. A decision on cutting it to about 4 months is due in March 2027.

08

Sources

All read 26 November 2026.

Elexon, The electricity trading arrangements: a beginner’s guide, version 9.0, 18 September 2025.

Elexon, BSC Section T, settlement and trading charges, version 47.0, 29 October 2026.

Elexon, BSC general glossary, version 133.0, 29 October 2026.

Elexon, BSC Section P, energy contract volumes and metered volume reallocations, version 23.0, 7 November 2024.

Elexon, BSC Section U, provisions relating to settlement, version 19.0, 28 September 2026.

Elexon, Imbalance pricing guide, version 17.0, 25 August 2026.

Elexon, P305 modification page.

MHHS Programme, run by Elexon: requirements for the transition to the new settlement timetable, version 2.3, 14 March 2025; MCAG headline reports of 15 September and 24 November 2026.