P415 in plain words

Last reviewed November 2026

P415 is a change to the Balancing and Settlement Code (BSC). It lets an aggregator sell the flexibility of a customer’s site in the wholesale electricity market without going through the customer’s supplier. Ofgem approved it on 6 October 2023, and it went live in one step on 7 November 2024.

01

What it changed

Before P415, the BSC gave all of a customer’s flexibility to its supplier. The exception was the Balancing Mechanism. Since December 2019, under modification P344, an aggregator could offer a site’s flexibility there to the system operator as a virtual lead party. To reach the wholesale market, including the power exchanges, a flexible customer still had to go through its supplier. P415 was raised on 30 September 2020.

02

A new role

P415 created a separate role for wholesale trading, the virtual trading party (VTP). A virtual lead party still only offers balancing to NESO. A VTP registers trading secondary BM units, made up of customer sites with half hourly or asset metering. Each unit sits within one grid supply point group, roughly one distribution network area. A VTP has to pass Elexon’s qualification checks before it trades.

03

How a trade is settled

A VTP buys and sells energy like any other trading party and notifies its trades to Elexon in the usual contract notifications. For each half hour in which it acts, it also sends a wholesale market activity notification before gate closure, one hour before the half hour starts. That makes the VTP responsible for the change in those sites’ volumes in that period.

Elexon then works out what the sites would have used without the trade, from a baseline built on their own recent meter data. The only approved method is BL01. It averages up to 10 similar working days from the last 60, or the middle 2 of 4 non working days, then adjusts the result on the day. The note on demand baselines covers it.

The gap between the sites’ metered volume and that baseline is the deviation volume. Elexon charges the VTP for any gap between the volume it traded and the deviation volume. It adjusts the supplier’s volumes back by the same deviation volume. The supplier’s imbalance is meant to be neither helped nor harmed by the trade.

04

Compensating the supplier

The supplier is paid compensation for the volume the VTP moved, at the supplier compensation reference price. That price is the wholesale cost part of Ofgem’s price cap, and it changes each time the cap does. If a VTP raises a site’s demand and the supplier sells that extra energy to the customer, the compensation runs the other way, to the VTP.

The BSC Panel unanimously recommended that the VTP pay the compensation. Ofgem approved the other option: the cost is shared across all suppliers, in proportion to the electricity their customers use.

05

Changes since it went live

Two fixes to the legal text, P465 and P473, went live on the same day as P415. Since then:

P444, live from 6 November 2025, added compensation paid directly by the virtual lead party for its actions in the Balancing Mechanism. Compensation for wholesale trades is still shared across suppliers.

P504 brought VTPs under Elexon’s performance assurance, the checks it runs on how parties meet their settlement duties, from 26 February 2026.

P511, live from 24 August 2026, limits which generation can use the route. Each pair of import and export meters is measured on its largest half hourly export in the past year. Above 10 MW it cannot use the route, and below 2 MW it can. Between 2 and 10 MW it cannot if it has been a net exporter over the past 30 days, on the rule’s adjusted measure.

Two proposals are still open. P510 would replace shared compensation with compensation paid directly by the VTP, and its assessment report goes to the Panel on 11 February 2027. P509 would set up monitoring of the net benefit of demand side response in the wholesale market.

06

Sources

All read 26 November 2026.

Elexon, P415 modification page, and the pages for P344, P444, P465, P473, P504, P509, P510 and P511.

Elexon, P415 final modification report, version 1.0, 15 June 2023.

Ofgem, decision on P415, 6 October 2023.

Ofgem, decision on P511, 10 August 2026.

Elexon, BSC Section A, parties and participation, version 14.0; Section S, supplier volume allocation, version 53.0; Section T, settlement and trading charges, version 47.0; general glossary, version 133.0.

Elexon, Baselining methodology document, version 3.0, 7 November 2024.

Elexon, Supplier compensation reference price methodology document, version 2.0, 6 November 2025.