What a demand baseline is
Last reviewed November 2026
A demand baseline estimates what a site’s meters would have shown if NESO had not instructed it, or if no wholesale trade had moved it. Delivery is the gap between that estimate and what the meters actually recorded.
Why the BSC uses baselines
Before modification P376, settlement always checked delivery against a unit’s final physical notification, the level it told NESO it would run at. Ofgem’s decision on P376 recorded that some assets struggle to give an accurate one. Ofgem said this caused wrong payments and non delivery charges, and put new providers off. It approved P376 on 6 August 2021, and the change went live on 23 February 2023.
Under P376, a virtual lead party (an aggregator registered for the Balancing Mechanism) or a supplier can choose which sites in a unit are baselined. Elexon’s settlement agent calculates the baselines from the sites’ own meter history. NESO still dispatches units on their physical notifications.
How BL01 works
BL01 is still the only baseline method approved under the BSC. It is used in the Balancing Mechanism and, under P415, for aggregators’ wholesale trades. It looks back over the last 60 days at days of the same type: working days for a working day, non working days otherwise. It skips days with missing data, clock change days, and event days the lead party has flagged, such as a day with an outage.
For a working day it takes up to 10 of the most recent eligible days and averages each half hour. With fewer than 5, the baseline falls back to the metered volume, and the site counts as having delivered nothing. For a non working day it ranks the 4 most recent eligible days by volume and averages the middle 2. With fewer than 4, it falls back to the metered volume.
When NESO accepts a unit’s bid or offer, an instruction to change its output or demand, BL01 adds an in day adjustment. It takes the average gap between metered volume and baseline over the 3 hours before gate closure for the first accepted period, and moves the baseline by that amount. Gate closure is one hour before the period starts. Wholesale trades on their own get no adjustment.
What NESO uses
In the Demand Flexibility Service (DFS), NESO pays sites to turn demand down or up. It uses BL01 without the in day adjustment, and household meters must always use it. Since 9 April 2026, business and renewable generation meters can instead send their own forecast for each half hour, no earlier than the start of the previous business day.
NESO can audit those forecasts and remove volume where they do not match. Providers must not change their demand on baseline days to raise or lower the baseline. When Ofgem approved forecast baselines for business and renewable generation sites in March 2026, it asked NESO to publish worked examples and to stay open to other methods.
In NESO’s response and reserve services, each unit declares its own baseline ahead of time, in the form of a physical notification. For Quick Reserve and Slow Reserve it is final 60 minutes before the period.
Other baseline types
For distribution network operators’ flexibility markets only, Elexon publishes five standard methods. Asset capacity takes the asset’s full rated capacity. Fixed reference uses a standard daily profile for a group of similar assets. Nomination uses values the provider declares in advance. Recent history averages recent days, as BL01 does. Zero assumes the site would have used or produced nothing.
How the baseline sets the payment
In a DFS turn down event, delivery is the baseline minus the metered volume, and payment is worked out from that delivery. In an invented example, a unit offers 0.6 MWh for a half hour at £300/MWh. Its baseline is 2.0 MWh and its meters show 1.4 MWh. It delivered all 0.6 MWh and is paid £180.
If a different method had put the baseline at 1.8 MWh, the same meter reading would count as 0.4 MWh. That is two thirds of the offer, and the unit would be paid £120.
Sources
All read 26 November 2026.
Ofgem, decision on P376, 6 August 2021.
Elexon, P376 and P415 modification pages; Baselining methodology document, version 3.0, 7 November 2024.
NESO, DFS procurement rules, version 5.0, 18 May 2026; DFS participation guidance, version 18, 10 August 2026; DFS service terms, version 4.0, 9 April 2026.
Ofgem, decision to approve amendments to the DFS terms and conditions, 25 March 2026.
NESO, Dynamic response services provider guidance, version 14, June 2026; Quick Reserve guidance, version 5, April 2026; Slow Reserve guidance, version 2, April 2026.
Elexon, as market facilitator: standard baselining methodologies, version 2.2, 1 April 2026.